EV charger grants in the Balearic Islands (2026): status and alternatives

In 2026 the grant for a home charging point in Mallorca was the Balearic Government’s FACTOR programme, which covered 70% of the cost, up to €2,500 for private individuals. It closed for applications on 17 October 2026 because its budget ran out, and MOVES III no longer accepts new applications either. Here is what happens if you have already applied, how the grant worked and which incentives remain if you combine the charger with solar panels.

EV charger grants in the Balearic Islands (2026): status and alternatives

Status: FACTOR 2026 closed on 17 October

Balearic Official Gazette (BOIB) no. 132 of 17 October 2026 closed the FACTOR 2026 application period that same day, because the applications received exceeded the funding available, including its possible extension. New applications can no longer be submitted under any programme, including charging points. There is no date for a new call; we are keeping an eye out for the next one.

If you have already applied, your application goes ahead: the decision is issued within 6 months of applying, and then the installation has to be documented. We can help you with the supporting documents.

How the grant worked: 70%, up to €2,500

Conditions of the 2026 call, now closed, for reference. FACTOR 2026 (programme 4) funded new private-access charging infrastructure. For a private individual the grant was 70% of the cost, capped at €2,500 per installation, a cap reached with an installation of about €3,570.

For businesses the percentage depended on size: 40% small, 30% medium and 20% large companies, capped at €12,000 per installation.

BeneficiaryGrantCap per installation
Private individual (no business activity)70%€2,500
Small company40%€12,000
Medium company30%€12,000
Large company20%€12,000

Technical requirements under FACTOR 2026

The rules required the charging point to meet these conditions:

  • Charging power up to 15 kW.
  • Single- or three-phase supply, 230–400 V AC.
  • At least one Type 2 connector (IEC 62196-2), compatible with mode 3.
  • Electrical protection under current rules and a CE declaration for the unit.

What about MOVES III?

The national MOVES III programme no longer accepts new applications, and the new Plan Auto+ 2026 only helps with buying the car, not installing the charger. With FACTOR 2026 also closed, we are not currently aware of any open grant in the Balearic Islands for a home charger.

Charger with solar panels

If you have or plan solar panels, the charger can prioritise surplus solar and charge the car almost for free during the day. Solar panels still have incentives available: your town hall’s IBI and ICIO tax rebates and income-tax deductions, subject to their conditions.

Indicative information. Grants and prices change; please confirm with us before deciding.

FAQ

Frequently asked questions

Is there a grant for a home EV charger in 2026?

There was in the Balearic Islands: FACTOR 2026 covered 70% of the cost, up to €2,500 for private individuals, but it closed for applications on 17/10/2026 because the budget ran out. If you combine the charger with solar panels, IBI and ICIO tax rebates and income-tax deductions remain.

What if I have already applied for the charger grant?

Your application goes ahead: the decision is issued within 6 months of applying, and then the installation has to be documented. We can help you with the supporting documents.

Is MOVES III still open for chargers?

No, it no longer accepts new applications. Plan Auto+ 2026 only covers buying the vehicle, and FACTOR 2026 closed on 17/10/2026.

Did the grant cover a shared garage?

Yes, if the charging point was for private use and met the technical requirements. In shared garages we also check the garage’s electrical installation and the owners’ association approval before installing.

Request a proposal

Request your free study

We reply within one working day. No obligation. We speak English.

+34 696 28 40 58 · WhatsApp

Controller: Sysefen Group 2024 S.L. Purpose: to handle your request and send you a quote. Legal basis: your request (pre-contractual steps). Recipients: no data is shared unless legally required; processors: IONOS (hosting) and Teamleader (CRM), within the EU, and Cloudflare (anti-spam check). Rights: access, rectification, erasure and more at contacto@sysefen.com. See the privacy policy for details.

Ready to start saving?

Free tailored study and site survey, with the care of a local company.