Solar panel tax rebate in Andratx
- IBI (property tax)
- 25–40 %, for 3 years
- ICIO (building tax)
- 95 %
- Conditions
- min 2 kW per 100 m²
According to the town hall bylaw checked on 24 September 2026. We confirm it in your study and file the application for you. Rebates in every municipality
How much does a solar system produce in Andratx?
According to the European Commission’s PVGIS tool, each south-facing kWp in Andratx produces around 1,568 kWh a year, the same as Palma. It is among the sunniest of the 53 municipalities we analysed (rank 5). The best month yields about 175 kWh per kWp and the weakest about 82 kWh.
A typical 5 kWp system therefore produces about 7,840 kWh a year, with indicative savings of €941 a year. Exact figures depend on your usage and roof.
What to consider in Andratx
Part of the municipality lies within the Serra de Tramuntana World Heritage Site. Panels there must blend into the roof and limit visual impact; we check planning conditions before proposing a system.
Many properties are second homes owned by international residents. We coordinate the installation even if you are away, and you can follow production on your phone.
On the seafront we use corrosion-resistant mounting systems and fixings suited to salt air.
Solar grants in Andratx
The Balearic Government’s FACTOR 2026 programme, which paid 45% towards home batteries, 70% towards EV charging points (max €2,500), 40–70% of the panel cost for businesses and 70% for owners’ associations, closed to applications on 17 October 2026 because its budget ran out. If you already applied, we help you with the final paperwork.
Municipal rebates still apply: we check whether Andratx town hall offers IBI or ICIO rebates for solar and handle the application for you. For your main home, Spanish taxpayers can also claim the national or Balearic income-tax deduction, subject to its conditions.
Fully turnkey
We handle the study, the Andratx town hall permit, installation, registration and applications for IBI/ICIO rebates where the municipality offers them.
- Fronius inverters or Enphase microinverters
- Tesla Powerwall 3 and compatible batteries
- 10-year (Fronius) or 25-year (Enphase) warranty
- Technical support from Palma
Andratx: hillside villas and sea air
Port d’Andratx, Camp de Mar and Cala Llamp are full of hillside villas with roofs on several levels, large glazed areas and high consumption from air conditioning and pools. In S’Arracó and Andratx town, the houses are more traditional, with tiled roofs.
Sloping ground and narrow access shape the installation, so we plan the logistics before starting. And because of the exposure to wind and salt, we reinforce the fixings and use corrosion-resistant materials.
We install throughout Andratx
- Port d'Andratx
- Camp de Mar
- Sant Elm
- S'Arracó
- Cala Llamp