How much does a solar system produce in Andratx?
According to the European Commission’s PVGIS tool, each south-facing kWp in Andratx produces around 1,568 kWh a year, the same as Palma. It is among the sunniest of the 53 municipalities we analysed (rank 5). The best month yields about 175 kWh per kWp and the weakest about 82 kWh.
A typical 5 kWp system therefore produces about 7,840 kWh a year, with indicative savings of €941 and a payback of around 6.9 years before grants. Exact figures depend on your usage and roof.
What to consider in Andratx
Part of the municipality lies within the Serra de Tramuntana World Heritage Site. Panels there must blend into the roof and limit visual impact; we check planning conditions before proposing a system.
Many properties are second homes owned by international residents. We coordinate the installation even if you are away, and you can follow production on your phone.
On the seafront we use corrosion-resistant mounting systems and fixings suited to salt air.
Solar grants in Andratx
In 2026 solar panels on private homes in Andratx have no Balearic grant, but batteries do (45% under FACTOR 2026) and so do EV charging points (70%, max €2,500). Businesses can receive 40–70% of the panel cost and owners’ associations 70%.
We also check whether Andratx town hall offers IBI or ICIO rebates for solar and handle the application for you.
Fully turnkey
We handle the study, the Andratx town hall permit, installation, registration and applications for grants and IBI/ICIO rebates where the municipality offers them.
- Fronius inverters or Enphase microinverters
- Tesla Powerwall 3 and compatible batteries
- 10-year (Fronius) or 25-year (Enphase) warranty
- Technical support from Palma
Andratx: hillside villas and sea air
Port d’Andratx, Camp de Mar and Cala Llamp are full of hillside villas with roofs on several levels, large glazed areas and high consumption from air conditioning and pools. In S’Arracó and Andratx town, the houses are more traditional, with tiled roofs.
Sloping ground and narrow access shape the installation, so we plan the logistics before starting. And because of the exposure to wind and salt, we reinforce the fixings and use corrosion-resistant materials.
We install throughout Andratx
- Port d'Andratx
- Camp de Mar
- Sant Elm
- S'Arracó
- Cala Llamp