The climate for heat pumps in Son Servera

Son Servera lies at about 82 m above sea level, in climate zone B3 of the Spanish Building Code (CTE). According to the 2014–2023 PVGIS series (European Commission), the coldest month is January, averaging 11.8 °C, and the municipality has about 330 heating degree days a year, 11% more than Palma (297). For comparison, Capdepera has 195 and Manacor 283.

In this climate, for a 120 m² home built between 1980 and 2006 we estimate a heating demand of about 6,000 kWh a year and about 7.4 kW of power, covered by a 8 kW Vaillant aroTHERM plus.

Compared with an oil boiler (about €1,620 a year for heating and hot water for 3 people), a heat pump with radiators would cost about €504: indicative savings of €1,116 a year. Underfloor heating or fan coils improve efficiency further.

Heat pump grants in Son Servera

If the heat pump replaces an oil, propane or gas boiler, a Vaillant unit earns about €2,000 in Energy Saving Certificates (CAE). For a main home, Spanish taxpayers can also deduct 40% of the investment from income tax, up to €3,000. And the installation can be financed interest-free. Check yours in 2 minutes with our grants calculator.

The Balearic Government’s FACTOR 2026 programme closed to applications on 17 October 2026 because its budget ran out. For reference, a 8 kW unit would have received up to €5,600 (€700 per kW of heating output). If you already applied, we help you with the final paperwork.

What to consider in Son Servera

For holiday homes, app control lets you switch on heating or cooling before you arrive.

Near the sea we protect the outdoor unit against salt air and position it to reduce noise.

Complete, certified installation

We calculate heat loads, choose the emitters, install the unit and hot-water tank, certify it under RITE and handle the CAE and the energy certificates for the income-tax deduction.

  • Vaillant aroTHERM plus or Saunier Duval GeniaAir Max (R290)
  • Underfloor heating, radiators or fan coils
  • Zone control and myVAILLANT app
  • 15-year warranty with the official Vaillant maintenance plan

We install heat pumps throughout Son Servera

  • Cala Millor
  • Cala Bona
  • Costa dels Pins

We work with leading manufacturers

  • VaillantCertified installer
  • Saunier DuvalCertified installer

Brands mentioned are trademarks of their respective owners.

Method

How we work: you decide, we take care of everything

One point of contact from the first study to the monitoring of your system.

  1. 01

    Initial advice

    We review your bills and real energy use.

  2. 02

    Site survey

    We check roof, orientation, shading and electrics.

  3. 03

    Study & proposal

    We compare options and show savings and payback.

  4. 04

    Fixed quote

    Itemised price with no hidden costs.

  5. 05

    Installation & paperwork

    Installation, permits, grid connection and grants.

  6. 06

    Monitoring

    Track your production from your phone, with a local team in Mallorca.

FAQ

Frequently asked questions

What size heat pump do I need in Son Servera?

For 120 m² of average construction, about 7.4 kW. It depends on insulation, windows and emitters; we calculate it during the site survey.

Can I keep my radiators?

Often yes, as Vaillant aroTHERM plus units reach high flow temperatures. We check during the survey.

Does a heat pump work in winter in Son Servera?

Yes. In Son Servera the coldest month averages about 11.8 °C, and Vaillant aroTHERM plus heat pumps are designed for climates far colder than Mallorca’s. We match the output and flow temperature to your home during the site survey.

Are there grants for heat pumps in Son Servera?

There was one under FACTOR 2026 (about €5,600 for a 8 kW unit), but it closed to applications on 17 October 2026 because its budget ran out. Still available: Energy Saving Certificates (CAE) when a combustion boiler is removed and the 40% income-tax deduction. We help with all the paperwork.